Part of the Harbour Reach development situated just south of Poole lifting bridge with stunning views across the harbour towards Arne. Arne View is a spacious duplex apartment benefitting from a large terrace balcony area overlooking Poole Yacht Club, Twin Sails bridge, Brownsea Island, Round Island, Arne and beyond towards the Purbeck Hills. Located just a few minutes walk to Hamworthy beach and park, and 10 minutes walk to Poole Quay and the town with all its facilities.
Lifts to 4th and 5th floor. Spacious hallways to front door. Private front door entrance door to 4th floor level with hallway to bedrooms. Further private front door entrance door to 5th floor level into open plan living area and terraces. Spacious open plan living / dining / kitchen areas with floor to ceiling windows and doors to the terrace balcony area and stunning views. Fully fitted kitchen with Bosch appliances. Cloakroom. Stairs leading down to master Bedroom (5ft kingsize double bed) with door leading to balcony area. Ensuite (bath with separate shower cubicle) Second bedroom (4ft 6in double bed), third bedroom (3ft single bed with pull-out bed option). Family bathroom (bath with shower over).
Parking - Two reserved parking spaces in the development`s own gated parking area under the apartments. (max height 2.1m / 6ft 8ins)
Services - Duvets and linen provided including bath and beach towels. Gas central heating. Hairdryers.
Technology - WIFI. 42 inch Smart TV. DVD player. Freeview. DAB music system. CD player. iPod docking system.
Kitchen - Dishwasher, electric oven / gas hob, fridge, freezer, microwave, washer / dryer.
Restrictions - No smoking. No pets.
Please note – Building works at Harbour Reach – External building works are presently underway with scaffolding being erected on both Sandpiper House and Puffin House blocks at Harbour Reach. The works are to deal with façade, roof and balcony door / window issues. Balconies and views are impacted and there will be some noise from time to time. The works to Sandpiper House and Puffin House are due to be completed in November 2024. We will continue to update our marketing as further details are received and update guests accordingly.